1 and 2 New Ludgate
Article from the June 2015 edition of the CIBSE Journal written by Phil Thompson.
Limited space and strict noise requirements led to a compact, enclosed chiller being specified for an office scheme at 1 and 2 New Ludgate, in central London.
The strict noise requirements of Land Securities’ commercial development helped to determine the specification of the chillers for the project. Air conditioning manufacturer Carrier worked closely with the client, consultant and contractor, SRW, to develop a compact, energy efficient design that enabled the chillers to be located in a restricted space. As a result, the chillers could be mounted on the rooftop, rather than in the basement, which was where the plant was located in the original design. This gave Land Securities more usable commercial space.
The chiller manufacturer designed and built a custom package to enclose the chillers and reduce the amount of noise. The condensers are specifically configured to resist damage from hailstorms that can otherwise create significant, accumulating, impact damage to the coils, reducing their performance.
Air conditioning for the buildings is supplied by six 930 kW (nominal) chillers with variable speed drive (VSD)-controlled screw compressors, alongside six smaller chillers with scroll compressors. The project included a bespoke pump, control and chiller sequencing package.
"The software was programmed in-house and designed to maximise energy efficiency and air conditioning performance, as well as extend the working life of the chillers by careful run-time sequencing," says Danny Lear, specification and solutions manager at Carrier UK. "We were able to carry out full witness testing of working chillers at our facility in France, ensuring the solution met the specification fully."
After installation, Carrier’s service team will, under a full-maintenance contract, ensure the chillers are maintained at peak performance level. The six screw compressor chillers are supplied with integral control that combines variable-speed condenser fans with variable-speed screw compressors, enabling close matching of cooling output to current load conditions. The constant control of the onboard intelligent control system, claims Carrier, enables the chiller to operate with very good part-load efficiency.
With the ability to vary both condenser fan speed and compressor speed in response to constantly changing demand, the chiller can continue to operate in its ‘sweet spot’ in terms of performance and energy efficiency. Carrier asserts it delivers a full-load energy efficiency ratio (EER) of up to 3.4 and a European seasonal energy efficiency ratio (ESEER) up to 4.9. Through a control system, building owners can monitor log performance data from the chiller via a web browser.
Newly introduced software optimises the use of compressors, fans and cooling circuits by constantly calculating the most efficient fan speed and water-flow rate, based on the current load and ambient conditions, and controls them to main appropriate refrigerant operating pressures through continuous feedback and adjustment.
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.